Holiday Home Bathroom Conversion

This house was reconfigured, the bedrooms were made smaller and the bathroom was made larger and split into an on-suite(Bathroom 2) and the main bathroom(Bathroom 1). We built the stud walls between the bathrooms and the bedroom. we also shifted a door frame and moved the bathroom door. we also had to build a new door frame for the on-suite.

The floor was a vinyl click and was cut into the shape of the bathroom, we also helped the bathroom fitter install the bath and shower. Finally, we sourced a new matching door for the on-suite and hung it with matching ironmongery.

Bathroom Tiling

We tiled this bathroom and installed the shower tray. The tiles in the shower area went all the way to the ceiling and carried on half height all the way round. we had to leave the bottom row to allow a floor to be built in later on.

Concrete Slab for Dog House

We dug out and poured a large slab for sitting dog sheds on, the slab was 27m long, we poured the slab in two sections to stop it from cracking. we finished up by digging a path along the front ad to the existing shed.

We built the shuttering in two sections, this allowed us to reuse the wood for the second section after the pour. we also laid waterproof sheets along the bottom to try and prevent rising damp. The slab also had a drain running through it, there were several ACO drains and a pipe that run the entire length of the slab.