We were tasked with getting as much done as we can with this roof before we head home, the main carpenter hired us because he didn’t have enough time. We managed to get all the ceiling joists in then the roof was finished by the other carpenters.
The bungalow had burnt down due to a fire from a heated blanket, we had to pull out all the remaining burnt material such as the existing roof, door frames, damaged floor boards and replace the wallplates and get rid of the sutt so that there isn’t a burnt smell left when were finished.
We cut the timbers to cover each room and then bolted them together so that they don’t shift, we also tied them into the wallplates with brackets.